Home           Products           Company           Contact us     
> Fundamentals of Control Engineering
> Components and Calibration
> Simple Process Engineering Control Systems
> Complex Process Engineering Control Systems
> Fundamentals of Process Engineering
> Mechanical Process Engineering
> Thermal Process Engineering
> Chemical Process Engineering
> Biological Process Engineering
> Water Treatment
Products  |  Process Engineering  |  Thermal Process Engineering  |  CE 400
CE 400 Gas Absorption Show data sheet (pdf file) Print page
CE 400 - A product from the GUNT 2E range
Technical Description

  Absorption is used to remove one or more gaseous components from a gas flow using a solvent.
  First of all, a CO2 and air gas mixture is produced. It is possible to adjust the mixing ratio using valves. The flow rates of the gas components are displayed.

  A compressor delivers the gas mixture into the lower section of the absorption column. In the column, part of the CO2 is separated in the counterflow with the solvent. Water is used as the solvent. The CO2 is absorbed by the downward flowing water. To separate the absorbed CO2, the charged water is then fed from the lower section of the absorption column into a desorption column. As the pressure is reduced and the temperature is increased, the solubility of the CO2 falls. A heater heats the water. A water jet pump generates the vacuum in the desorption column and causes the CO2 gas to be emitted from the water. A pump then delivers the regenerated solvent back into the absorption column.

  The water temperature can be controlled. Flow rate, temperature and pressure are continuously measured. The two-section column is equipped with connections to determine the pressure losses. The pressure loss in the respective sections can be displayed via 2 U-tube manometers. To evaluate the success of the process, the trainer includes outlets for taking gas and liquid samples. The gas samples can be analysed using the hand-held measuring unit supplied.
  The well-structured instructional material sets out the fundamentals and provides a step-by-step guide through the experiments.

 

Learning Objectives / Experiments

- investigation of the absorption process when

  separating gas mixtures in a packed column
- determination of pressure losses in the column
- representation of the absorption process in an

  operating diagram
- investigation of the variables influencing the

  effectiveness of absorption

Features

* Separating a CO2/air mixture by absorption in

  counterflow1
* DURAN glass packed column with Raschig rings1
* Safe operation due to use of water as the solvent

  and non-hazardous gases1
* Regeneration of solvent by vacuum1
* Gas analysis with hand-held measuring unit

Alternative products
RT 681 -- Multivariable Control: Vacuum Degassing
Specification

[1] separation of CO2/air mixture by absorption in counterflow with water
[2] production of gas mixture using CO2 from compressed gas cylinder and ambient air
[3] adjustment of mixing ratio using valves
[4] compressor for delivering the gas mixture into the absorption column

[5] DURAN glass absorption column (packed with Raschig rings) and desorption column 
[6] continuous solvent regeneration in circuit with desorption column under vacuum

[7] 1 pump for desorption column and 1 pump for returning solvent to absorption column
[8] water temperature control with heater and refrigeration system

 

Technical Data

Absorption column
- height: 2x 750mm, internal diameter: 80mm

Desorption column
- height: 750mm, internal diameter: 80mm
2 pumps (absorption/desorption)
- max. flow rate: 17,5L/min
- max. head: 47m
1 pump (cooling)
- max. flow rate: 29L/min
- max. head: 1,4m

Compressor
- max. positive pressure: 1bar
- max. flow rate: 4,2m/h
 

Measuring ranges

- flow rate: CO2: 0,4...5,4L/min, air: 0,2...2,4Nm/h,

  solvent: 50...600L/h

- temperature: 1x 0...80C, 2x 0...60C

- pressure: 1x 0...2,5bar, 1x -1...0,6bar

- differential pressure: 2x 0...250mmWC

- C02-content: 0...100vol%
 

Dimensions and Weight
LxWxH: 1.750x790x2.300mm
Weight: approx. 350kg
Required for Operation

230V, 50/60Hz, 1 phase or 230V, 60Hz/CSA, 3 phase

CO2 gas cylinder with pressure reducing valve
Water connection: 250L/h, drain

Scope of Delivery

1 trainer
1 hand-held measuring unit for gas analysis

1 set of hoses
1 set of instructional material

Order Details
083.40000  CE 400  Gas Absorption
Print
© 2005 G.U.N.T. Gerätebau GmbH